ATHLETIC TRACK

Sandwich System

This product is applied on fine asphalt or smooth, waterproof concrete, without rising humidity issues, with a 13mm base layer that is mixed onsite. It consists of RECYCLED RUBBER. The polyurethane binder is the second layer which is the sealing layer. It is the coloured polyurethane sealing material on top of the cushion mixture. The third layer or the surface layer is a PU coloured polyurethane material which is then broadcasted with EPDM granules on top to finish it.

1. Polyurethane primer.
2. Mixture of Polyurethane binder and SBR 0.5-2mm, applied by paving machine.
3. Application of sealing layer (in combination with EPDM dust).
4. Application of Polyurethane Self Level top layer.
5. Broadcasting of EPDM granules.
6. Line Marking.

Spray System

This product is a synthetic outdoor system with a total thickness of 13mm-14mm. It is applied on fine asphalt or smooth, waterproof concrete, without rising humidity issues. The first base layer of 11mm-12mm is mixed onsite, and consists of recycled rubber and the polyurethane binder. Then as the second layer, a spray coat is applied onsite with an average thickness of 2mm, which consists of EPDM and the colored polyurethane binder.

1. Polyurethane primer.
2. Mixture of PU Binder and Recycled Rubber is applied by the paving machine.
3. Mixture of PU Self level and the EPDM is applied by the spraying machine in two crossings.

Full PUR System

This product is a synthetic outdoor system with a total thickness of 14mm. It is applied on fine asphalt or smooth, waterproof concrete, without rising humidity issues. After laying a PU primer for adhesion, a PU pore filler is applied as a sealing layer, then follows the first layer or base layer, which consists of laying the FULL-PU colored polyurethane material  and broadcasting Recycled Rubber, 1mm-4mm on top (fresh-on-fresh). Then the second layer comprising again of the Full-PU coloured polyurethane material is laid on the surface and Recycled Rubber, 1mm-4mm is broadcast on top (fresh-on-fresh). The third layer (surface layer) is the full-PU coloured polyurethane material laid on the surface and EPDM granules 1mm-3mm is broadcast on top to finish it off (fresh-on-fresh).

1. PU Polyurethane primer.
2. PU Sealing layer.
3. Mixture of PU wearing coat, coloured full-PU material plus SBR granules.
4. Mixture of PU wearing coat, coloured full-PU material plus SBR granules.
5. Mixture of PU wearing coat, coloured full-PU material plus EPDM granules.

Call Now to Enquire!
WhatsApp chat